Batu Dam, Selangor
Batu dam is a flood control and water supply dam constructed under the Kuala Lumpur Flood Mitigation Project.
Its construction was completed in 1987.
The dam is located immediately downstream of the confluence of Sungai Batu and Sungai Tua which is about 16km upstream of the city centre of Kuala Lumpur.
Currently, Puncak Niaga is abstracting water direct from the dam for domestic and industrial water supply to some parts of Kuala Lumpur.
The main project components are an earthfill main embankment, a spillway and outlet works.
The dam is a zoned earthfill embankment. The spillway is a side-channel inlet structure with a long crest.
The outlet works is located at the base of the left abutment to the right of spillway structure and consist of an intake structure with multilevel intake gate and two flood control opening, an upstream conduit, a gate chamber, a downstream conduit, a control structure and a stilling basin.
The outlet works deliver water to the municipal and industrial pipeline at the control structure.
Background of Project |
Location |
Year Completed |
Year of Construction |
Project Cost |
Gombak, Selangor |
1987 |
1985 |
RM 19,700,000.00 |
Information of Structure |
Reservoir Area |
Capacity |
Catchment Area |
Height |
Crest Length |
Structure Material |
Crest Elevation |
Spillway Type |
2.50 Km² |
36.6 Mm³ |
50.0 km² |
44.0 m |
550 m |
Earthfill |
109.0 m |
Ungated side channel Inlet Ogee Crested |
Bekok Dam, Selangor
Bekok dam is located in the mid-western part of the State of Johor. It is located about 6km off the Yong Peng-Segamat road and is also accessible by laterite road.
Construction of the dam started in August 1987 and completed in November 1990.
The dam was a component of the Western Johor Integrated Development project.
Its primary function, together with Sembrong Dam is to mitigate flooding by Sungai Batu Pahat and was designed to provide a 25-year flood return period with maximum release of 50 cumecs.
The dam comprises three main dams (Main Dam 1A, 1B and 1C), eleven saddle dams (Saddle Dam 1 to 11), a gated flood release outlet, an ungated spillway, a grass auxilliary spillway, a diversion channel with compensation outlet system and draw off pipeworks.
Background of Project |
Location |
Year Completed |
Year of Construction |
Project Cost |
Batu Pahat, Johor |
1990 |
1987 |
RM 22,000,000.00 |
Information of Structure |
Reservoir Area |
Capacity |
Catchment Area |
Height |
Crest Length |
Structure Material |
Crest Elevation |
Spillway Type |
12.0 Km² |
32.0 Mm³ |
326.0 km² |
20.30 m |
3,640 m |
Earthfill |
23.0 m |
Ungated Ogee Crested |